Cost rate
Approximate consumption: 1.5-2kg/m2
Drying time:
Apply the second layer after the first layer is completely dry. In normal
conditions (T = + 23-25 °C, relative humidity = 50-60%), it takes about 6 hours.
Discharge:
If there is a need to adjust the consistency of the mixture being worked with,
up to 1% water can be added.
Approximate consumption: 1.5-2kg/m2
Drying time:
Apply the second layer after the first layer is completely dry. In normal
conditions (T = + 23-25 °C, relative humidity = 50-60%), it takes about 6 hours.
Discharge:
If there is a need to adjust the consistency of the mixture being worked with,
up to 1% water can be added.